Installation Methods:
①Place left & right arm on basic rail, connect it to stand with pivot pin.
②Lift the arm, place spring seat, leaf spring and seat in order on the basic track below the shoe block.
③Use the brake rail to clamp shoe block, and also rail head of basic rail, and then use the three bolts to connect to brake rail. Note that the outer two bolts must pass through the support frame, seat should be located in the middle of the pressure hole.
④Front and back beam and upper and lower beam connected to four corners below arm, as shown in figure, the middle of the two oblique beam and the four corners connected with pin. After finishing the above initial installation, fasten all the bolts.
⑤Booster is installed on the basic rail, place spring seat, plate spring and seat in turn and then with the two-way brake rail to clip it in the middle, also grip rail head of the basic rail, then use two bolts to tighten the brake rail. The first pair of boosters is 100 mm from the main frame and the second pair of boosters is 80 mm from the first pair, parallel to each other with an error of no more than 2 mm.
⑥Press each spring plate with pressurizer: press U-shaped pressure block into neutral position on both sides of seat, press screw head mounted on center nut of pressurizer to align with pressure block, prssurizer rail base plate hang on both sides hook on basic rial base plate, tighten with nuts, with a length of about 1.5 meters iron rod to screw pressure screw and wedge iron bewteen seat and plate spring to make gap of plate spring and spring seat 0.6 ± 0.05 mm.
⑦Install the sign on the stand
⑧After installation, paint mark on rail waist to facilitate daily check whether buffer stop is crashed.