- Mine Car & Wheel Set
- Mining Man Car
- Mine Locomotive
- Muck Shovel Loader
- Mucking Machine
- Scraper Conveyer
- Belt Conveyor
- Mine Communication
- Air Compressor
- Ventilation Equipment
- Overhead Passenger Device
- Monorail Crane
- Roadheader Machine
- Rock Loader
- Mining LHD
- Coal Shearer
- Mine Car Dumper
- Coal Cutter
- Mining Electric Appliance
- Gas Drainage Pumping Station
- Rail Catcher
- Steel Rail
- Railway Sleepers
- Rail Cutting Machine
- Rail Transit Equipment
- Track Switch
- Railway Parts
- Mining Steel
- Rail Arrester
- Steel Shot
- Steel Plate & Steel Sheet
- U Channel Steel Support
- Hydraulic Acrow Props
- Hydraulic Roof Supports
- Hinged Bar
- Anchor Bolt
- Anchor Agent
- Mining Lamp
- Mining Lamp Battery Charger
- Self Rescuer
- Oxygen Filling Pump
- Air Breathing Respirator SCBA
- Protection Equipment
- Mobile Gas Drainage Pumping
- Gas Detector
- Concrete Rebar Detector
- Flowmeter
- Radiation Dosimeter
- Testing Meter
- Moisture Meter
- Water Finder
- Metal Detector
- Hardness Tester
- Flaw Detector
- Pipe Inspection Camera
- Engineering Instrument
- Pipe Leak Detector
- Guniting Equipment
- Wall Rendering Machine
- Spraying Machine
- Construction Mixer
- Mobile Concrete Mixer Truck
- Road Roller Compactor
- Road Construction Machine
- Excavator
- Pile Driver
- Light Tower
- Athletic Field Equipment
- Concrete Saw Cutter
- Rebar Tying Machine
- Rebar Cutter and Bender
- Cable Construction Equipment
- Shipping Container
- Pavement Repair Vehicle
- Hydraulic Power Station
- Road Sweeper
Mining Equipment
Mining Railway Equipment & Steel Rail
Mining Support Equipment
Mining Lift Equipment
Mining Safety & Protection Equipment
Instrument And Meter
Construction Machine
Mining Drill Equipment
Pump Equipment
Steel Material
UAV
Crawler Transport Vehicle

Product YD-120,it can make the pile 6 meters deep in average 3 minutes.Corrosion resistence and high fuel oil efficient,it can save lots of dollar for you and you company relating to maintance and usage.Adopt amount of manganese steel during manufacturing and processing,which make her suitable for all kinds of geological enviroment.
Product YD-230,which also called photovoltaic solar spiral pile drilling machine,adopt new-style hydraulic technique.large rotation torque,the structure of the drilling rig is compact.During operation,the slide-skid are supported on the the ground to ensure the drilling has good stability.You'll getthe experience of Durability through the entire progress.
Product YD-547 hydraulic crawler drill rig,adopt new hydraulic technology,low energy consumption.large rotation torque,convenient hole deflection.Compactmachine structure.Due to the mast has adjustable compensation function.When drilling ,the mast can be supported on the ground,so the borehole quality is stable.
flexible operation
Compact structure
Work strength
High efficiency
Easy to transport
The running mechanism of the electric crawler type spiral pile driver is mainly composed of a motor, a walking speed reducer, a driving wheel, a supporting chain wheel, a supporting wheel, a guide wheel and a track.
The drilling part is composed of power head (motor, three ring reducer), long spiral drill pipe and drill bit.
The frame of photovoltaic pile driver is mainly have two model:hydraulic walking pile frame or electric crawler pile frame.
The whole machine have the advantages of strong traction force,good stability,Strong adaptability to site, good climbing capacity ,good flexibility etc.

1.The machine adopt caterpillar mobile form,good maneuverability and exact placing.Also the electrical hydraulic part totally adopt centralized control,convenient operation,greatly reduce the worker's labour.

2.The walking mechanism adopt integral rigid suspension system,the upper operation mechanism adopt 3 pivot structure,having advantages of quick movement and placement.

3.In addition to the four support-leg and walking mechanism adopting hydraulic system,the remaining construction adopt mechanical transmission system,reliable operation,convenient maintenance,amount of additional working device and setting make a a wide application scope.

4.Winding motor adopt resistance control,meet the requirement of speed improving when grouting different aperture.the deployment of this machine is smooth,littte impact on the whole structure,extend the working time.



The pile installation site should be smooth and solid.If the site bearing capacity can not reach the minimum operation requirement in compressive stress.The foundation box or 30mm thick steel plate shoule be laid under the caterpillar track.The spacing shall not more than 30mm.
Review Safe Operating Practices and division/program specific plans for working around pile driving activities.Park in areas that: provide safe entrance and exit of the work area; do not create potential conflicts with other vehicles and equipment operating in the work area.Wear appropriate personal protective equipment consistent with the hazard. Hard hats, safety shoes, safety glasses and vests are standard required equipment. Hearing protection is often needed.
Avoid walking and working under suspended loads. Employees on foot must use extreme caution to stay clear of operating equipment. Always establish eye contact with the operator before approaching equipment.Proper lifting techniques shall be used when lifting, moving or positioning monitoring equipment or instruments. Get help or use mechanical aids if necessary.Be aware of escape routes in case of emergency. Be aware of loose materials, excavation drop-off, tripping hazards and other obstructions.
Allow ample space in all directions to work safely. Ensure that you know the location of all utilities in and near work site prior to commencing work. Ask the site foreman for the location.Be aware of poisonous plants, insects and snakes. It is a good practice to wear long sleeve shirts, gloves and high-top boots when hazards cannot be avoided.Keep walk spaces and work areas free from loose materials or tools.
Review MSDS for all hazardous materials being used or expected to be encountered.Be aware of pinch points and crushing hazards. Take extra precaution to prevent heat and cold stress when working in extremely hot or cold temperatures. Employees should wash hands before eating, drinking or smoking.
Product Model | |||||
YD-120 | YD-230 | YD-547 | |||
Bore diameter | 90-300mm | Power rating | 50 KW | Motor power | 55KW |
Bore depth | 20-100m | Rated speed | 2400 r/min | Rotation speed | 0-60r/min |
Air consumption | 10-26m³/min | Start the voltage | 24 V | Air consumption | 10-15m³/min |
Air pressure | 0.7-1.6Mpa(medium) 1.6-2.46Mpa(high) |
Air pressure | 0.8-1.8Mpa(medium) 1.8-2.83Mpa(high) |
Working pressure | 0.7-1.6Mpa |
Pipe diameter | 76mm/89mm | Crawler plate width | 260 mm | Boom swing | Left 90 right45 |
For rock | F=6-20 | Highest pole | 4370mm | Boom pitch | Up and down 60 degree |
Bore diameter | Max 400mm | Scope of operation parameters of borehole diameter |
400-800mm | Bore diameter | 90-400mm |
Bore depth | 0-30m | Maximum drilling depth | 15m | Bore depth | Horizontal 40 down 50 |
Screw pipe diameter | 130-400mm | Drill pipe rotation speed | 0-71 r/min | Feed stroke | 3000mm |
Once promotion | 2000mm | Hydraulic system of main pump model |
CBG1 - F032/032 | Drill rod diameter | 76mm |
Skid pitch | 100° | The main pump speed |
2000-2400L/min | Guide compensation | 900mm |
Swinging angle of skid |
Left and right total 40° |
The main pump pressure |
20 Mpa | Lifting force | 24800N |
Drill pipe rotation speed |
0-70r/min | The main valve flow | 100 L/min | Guide pitch | Up and down 45degree |
Power rating | 56Kw | Hydraulic tank volume | 200L | Guide swing | Left 40 right30 |
Climb ability | 35° | Climb ability | degrees 30 | Climb ability | 30 degree |
Dimension (L*W*H) |
4460*1950*2460 (mm) |
Dimension (L*W*H) |
4370 x 2010 x 4290 (mm) |
Ground clearance | 260mm |
weight | 4360Kg | weight | 4590Kg | Total weight | 38000kg |
Walk speed | 0-2.5km/h | Walk speed | 0-5 KM/h | Walk speed | 0-2.5km/h |
Product Feedback
History Feedback: (0)
Latest Feedback